The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Department of Natural Resources Fisheries Program is currently requesting proposals for the development the following products within the Desolation Creek subbasin;

• A 100% permitted design using the HIP III Biological Opinion for Reach 3 (RM 2.6 to 4.5) capable of improving and restoring the form, function, and connectivity of an active floodplain and stream channel habitats and effective habitat complexity based upon principles contained within the Umatilla River Vision.

• Participate in necessary meetings and coordination for the design noted above.

• Provide engineering oversight during restoration design implementation.

• Develop ‘as-built’ drawings to document post-implementation site conditions.

Design, permitting, design implementation oversight, and as-built plan development will occur over multiple years. Design and permitting efforts are expected to occur during 2018 and early 2019. Implementation oversight and as-built plan development are tentatively planned for 2020.

Attach File: Tribal Service: Topics:
RFP