*CTUIR TRIBAL MEMBER* 2019 COLUMBIA RIVER SUMMER SEASON EMERGENCY REGULATIONS

The attached Sumer Season Fishing Regulations were adopted today June 19, 2019.

CTUIR Tribal Member Zone 6 Fishery Re-Opening

The attached regulations were adopted today June 12, 2019.

*SUBMISSION DATE CHANGE* Request for Quote Middle Upper Grande Ronde River

AMENDED:  Submission Date will be June 11, 2019 @ 2 pm as the CTUIR Office will be closed on June 10, 2019 in observance of CTUIR Treaty Days.

REQUEST FOR PROPOSAL (RFP) Walla Walla River Basin and Umatilla River Basin Terrestrial NIR LiDAR, Topo-bathymetric LiDAR and 4-Band Orthoimagery Acquisition and Post-processing

Please see attached RPF for further information.

*CLOSURE* CTUIR Tribal Member Spring/Summer Chinook Tributary Fishing Closure

Closure on Umatilla River will take effect on May 28, 2019.  All other Tributaries remain closed.

Lower Umatilla River Pacific Lamprey Fishery Regulations

The attached "Lower Umatilla River Pacific Lamprey Fishery Regulations" were approved by the Fish and Wildlife Commission on May 14, 2019.

*INVITATION FOR BID* North Touchet RM 3.3-4.3 (1) Harvest & Haul Whole Trees (2) Gather Construction Materials (3) Provide Construction Services (4) Conduct Post Construction Survey

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR), Department of Natural Resources Fisheries Program is currently requesting bids for implementation of the North Touchet RM 3.3–4.3 Fish Habitat Enhancement Project design package

*REQUEST FOR PROPOSALS* Granite Creek Mine Tailing Restoration Effort; Implementation

The project area is located on property owned and managed by Robert Pedracinni, Cody McConnell, and Bob McConnell and/or the Umatilla National Forest approximately 2 miles west of Granite, Oregon in Township 8 South, Range 35 East, a

*INVITATION FOR BID* Granite Creek Mine Tailing Restoration Materials Supply

The project area is located on property owned and managed by Robert Pedracinni, Cody McConnell, and Bob McConnell and/or the Umatilla National Forest approximately 2 miles west of Granite, Oregon in Township 8 South, Range 35 East, a

*REQUEST FOR PROPOSAL* Taylor Dam Removal Fish Passage Project

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Department of Natural Resources is currently requesting proposals to provide construction services for the removal of a channel spanning, concrete diversion dam.